The Georgia Department of Transportation (GDOT) is seeking feedback about a proposed solution and offsite detour for replacement of the existing State Route (SR) 85 bridge over the CSX Railroad #639361Y in Woodbury, Georgia.
The bridge would be replaced on the existing alignment and a temporary offsite detour is being proposed during construction of the bridge. Georgia DOT is also seeking feedback about the proposed detour.
Georgia DOT invites you to review the materials presented below and provide feedback by April 10, 2024.
When will King Road be repaired and, hopefully, paved?
What about the one in warm springs will it ever get finished
What about the one in warm springs will it ever get finished